Heliostar

HELIOSTAR

What was involved in that project?

FOUNDATION

  • Foundation Design
  • Cutting cement floor and hauling away debris
  • X-Ray Foundation Work and Piles Per Manufacturer’s Drawing
  • Pump Cement
  • Angle Bars
  • Paint Floor with Epoxy Paint Concrete Compression Test Reports

WATER AND REFRIGERATION

  • Supply and Install Chiller and Piping
  • Supply Water Line Process Piping

HEATERS AND BOILERS

  • Supply and Install High Temperature Boiler
  • Thermal Oil Systems
  • Upgrade Gas Meter
  • Gas Lines and Regulator
  • Temperature Control Supply

ELECTRICAL

  • Installation of Power Transformer Supplied by Manufacturer
  • Supply Grounding Protection
  • Install Distribution Electrical Panel

FIRE SUPPRESSION AND SAFETY

  • Install Fire Suppressor with CO2
  • Design and Retrofit Safety Interlocks and Physical Barriers to Bring Old Equipment to Code
  • Train Staff

FRESH AIR AND EXHAUST

  • Fresh Air Supply
  • Chimney and Vents for Burner
  • Exhaust Systems
  • Run Compressed Air Lines
  • Supply Air Duct Work
  • Insulation of Ducts

COMMUNICATION AND CONTROL

  • Cabling and Communication
  • Internet and Telephone Lines Work

INK / SOLVENTS/ ADHESIVES

  • Locate and Setup Ink and Solvent Reservoirs
  • Ink and Adhesive Agitation Systems
  • Solvent Recovery
  • Automated Cleanup

For information about Heliostar, Call Sunnyday at 204.783.0912 or Toll Free at 1.855.778.5271 or visit our “Contact Us” page.